Call 811 Overview
Follow these 5 steps when contacting your local 811 for service.
Driveway Boring What Is 811 | Contractor Notify Utilities
Driveway Boring What Is 811 | Contractor Notify Utilities
Step 1. Notify your local one-call center by calling 811 or making an online request 2-3 days before work begins. The one call-center will transmit information to affected utility operators.
Driveway Boring What Is 811 | Contractor Wait Utilities
Driveway Boring What Is 811 | Contractor Wait Utilities
Step 2. Wait 2-3 days (varies by state) for affected utility operators to respond to your request. On average, between 7-8 utility operators are notified for each request.
Driveway Boring What is 811 | Contractor Confirm Utilities
Driveway Boring What is 811 | Contractor Confirm Utilities
Step 3. Confirm that all affected utility operators have responded to your request and located accurately. State laws vary on the process for confirmation. If you see clear evidence of a utility, such as an above ground marker, manhole cover or utility box, but no marks, please call 811 so that utility can be notified.
Driveway Boring What is 811 | Contractor Respect Utilities
Driveway Boring What is 811 | Contractor Respect Utilities
Step 4. Respect the marks. The marks provided by the affected utility operators are your guide for the duration of your project. If you are unable to maintain the marks during your project, or the project will continue past your requests expiration date (varies by state), please call 811 to ask for a re-mark.
Driveway Boring What is 811 | Contractor Dig Carefully Utilities
Driveway Boring What is 811 | Contractor Dig Carefully Utilities
Step 5. Dig carefully. State laws generally prohibit the use of mechanized equipment within 18-24 inches of a marked utility, which is called the tolerance zone. If you must dig near the marks, hand dig or use vacuum excavation to expose the facility. After exposing the facility, avoid using mechanized equipment within the same tolerance zone.